
Accordingly, before 9:00 a.m. on October 19, Song Bung 2 reservoir brought the water level to 597m, A Vuong reservoir to 372m. At the same time, the two companies proactively changed the reservoir operation mode according to the regulations of the Inter-reservoir Operation Procedure on the Vu Gia - Thu Bon River Basin.
Dak Mi Hydropower Joint Stock Company, Song Bung Hydropower Company, Song Tranh Hydropower Company calculate, operate and regulate to ensure that the water level of Song Tranh 2, Dak Mi 4, and Song Bung 4 hydropower reservoirs is not higher than the lowest flood level and switch the reservoir operation mode according to the regulations of the inter-reservoir operation process.
The Da Nang City Civil Defense Command requires that the organization of operations must ensure operating principles, avoid sudden changes; organize information and notification to the authorities and people in the downstream area about the operation and regulation of the lake.
Regularly provide flood forecast bulletins on the lake and rainfall data from measuring stations in the lake basin to the City Civil Defense Command, Department of Agriculture and Environment, Department of Industry and Trade and related units and localities to serve the monitoring and consulting work.
Source: https://baodanang.vn/ha-dan-muc-nuoc-cac-ho-thuy-dien-tren-luu-vuc-song-vu-gia-de-chu-dong-don-lu-3306559.html
Comment (0)