Vietnam.vn - Nền tảng quảng bá Việt Nam

4 medical facilities selected as inauguration points to celebrate the 80th anniversary of National Day

The country will have 80 selected connection points spread across 34 provinces and cities. Among them, the health sector will have 4 projects selected as online and direct connection points.

VietnamPlusVietnamPlus18/08/2025

On August 19, groundbreaking and inauguration ceremonies for projects and works will take place across the country to celebrate the 80th anniversary of the National Day of the Socialist Republic of Vietnam (September 2, 1945 - September 2, 2025). There will be 80 selected connecting points across 34 provinces and cities with a total of 250 works being started and inaugurated simultaneously. Among them, 4 works in the health sector will be selected as online and direct connecting points.

These are the projects: Investment project to build an Intensive Care Center for Poison Control and purchase medical equipment. The inauguration ceremony will be held at Thai Nguyen Central Hospital, with a scale of 120 inpatient beds, a level III project, group B, with a total investment of 153 billion VND; the project was chosen as an online bridge point.

The project to invest in the construction of the Central Maternity Hospital 2 in Kieu Phu commune, Hanoi city with a scale of 300 inpatient beds, group A project, level I, total investment of 950 billion VND and was selected as an online bridge point.

The Central Maternity Hospital's second facility is built on an area of ​​nearly 60,000 m², of which the construction area is more than 8,400 m². The project consists of 6 floors above ground, 1 technical floor and 1 attic floor, designed in a modern style, optimizing functionality, being environmentally friendly and convenient for patients. According to the plan, the hospital receives about 1,000 visits per day.

The Provincial General Hospital Project at Thai Binh Medical Center, Hung Yen Province with a capacity of 1,200 beds, planned to expand to 1,500 beds, has a total investment of 2,733 billion VND. This is the project chosen as a direct bridge point.

Nghe An Oncology Hospital construction project with a scale of 1,000 beds (including: 8-storey main building, funeral home, auxiliary works) with a total investment of 1,259 billion VND. The inauguration ceremony was chosen as the main direct connection point./.

(Vietnam+)

Source: https://www.vietnamplus.vn/4-cong-trinh-y-te-chon-la-diem-cau-khanh-thanh-ky-niem-80-nam-quoc-khanh-post1056383.vnp


Comment (0)

No data
No data

Same tag

Same category

Spend millions to learn flower arrangement, find bonding experiences during Mid-Autumn Festival
There is a hill of purple Sim flowers in the sky of Son La
Lost in cloud hunting in Ta Xua
The beauty of Ha Long Bay has been recognized as a heritage site by UNESCO three times.

Same author

Heritage

;

Figure

;

Enterprise

;

No videos available

News

;

Political System

;

Destination

;

Product

;