Vietnam.vn - Nền tảng quảng bá Việt Nam

Hand over clean land for railway underpass in Quang Tri before September 15

Báo Giao thôngBáo Giao thông12/09/2023


According to Giao Thong Newspaper's reporter on September 12, the Km 607+920 railway underpass in Gio Linh district, Quang Tri province has been completed by the contractor, and the roof on both sides of the bridge abutments is being urgently completed.

However, the road section from National Highway 1 to the railway underpass at Km 607+920 is still in disarray. Here, in addition to an electric pole that has not been relocated, a number of constructions within the clearance area have not been completely dismantled.

Bàn giao mặt bằng sạch hạng mục cầu chui đường sắt ở Quảng Trị trước ngày 15/9 - Ảnh 1.

The railway underpass section Km 607+920 has been completed, the contractor is constructing the roof on both sides of the bridge abutments.

"Currently, the underpass section has been completed. We are mobilizing more vehicles to focus on completing the road section of this railway underpass project as soon as we have a clean site," said a representative of the construction contractor.

The project of the railway underpass corridor at Km 607+920 in Gio Linh district is part of the project to reinforce weak tunnels, open new stations and renovate the upper-floor architecture of the Vinh - Nha Trang section of the Hanoi - Ho Chi Minh City railway line.

When completed, this project will eliminate the potential risk of traffic accidents at the intersection between the road and the railway, which used to be a "black spot" for accidents; at the same time, it will contribute to improving the transport infrastructure, improving the capacity of transporting goods, and developing the local economy and society.

However, the site clearance work for the construction of this project has been very slow in the past, affecting the construction progress of the invested construction projects as well as the construction progress of the package and the entire project.

Bàn giao mặt bằng sạch hạng mục cầu chui đường sắt ở Quảng Trị trước ngày 15/9 - Ảnh 2.

The road section from National Highway 1 through Gio Linh town to the underpass is still in disarray, some constructions have not been dismantled yet, and electric poles have not been relocated to hand over the clean site.

Within the scope of land acquisition for construction of railway crossing and bridge at Km 607+920, there are 13 affected cases.

Gio Linh District People's Committee has committed to completing site clearance and handing over the entire clean site to the investor and construction unit before February 22.

However, Gio Linh district only handed over the construction site (phase 1) on March 23. Recently, the handover of the remaining site in August 2023 has also continued to be "missed".

According to Project Management Board 85 (project investor), the unit has just sent a document requesting the People's Committee of Gio Linh district to urgently complete site clearance work to hand over the entire clean site to the construction contractor before September 15.

The railway underpass Km 607+920 has been completed, but the road section leading to the underpass is still stuck with site clearance.

In case the site clearance is still not completed before September 15, the Gio Linh District People's Committee is requested to respond in writing so that Project Management Board 85 can report to the competent authority to consider and decide on continuing to invest in the remaining road section of the project package.

According to Gio Linh District People's Committee, the District People's Committee has assigned the Project Management Board, Land Fund Development and Industrial Cluster Development Board to preside over and coordinate with Gio Linh Electricity Branch and Gio Linh Town People's Committee to relocate an electric pole within the site clearance area for construction.

At the same time, mobilize affected households to urgently dismantle compensated and supported construction works to hand over clean sites to investors and contractors before September 15.

Bàn giao mặt bằng sạch hạng mục cầu chui đường sắt ở Quảng Trị trước ngày 15/9 - Ảnh 4.

After Gio Linh district handed over the site (phase 1), on May 9, Gio Linh district People's Committee also issued a document approving the traffic organization plan to construct the safety corridor and railway underpass at Km 607+920.

Bàn giao mặt bằng sạch hạng mục cầu chui đường sắt ở Quảng Trị trước ngày 15/9 - Ảnh 5.

Crossroad Km 607+920 before investment in underpass.

Bàn giao mặt bằng sạch hạng mục cầu chui đường sắt ở Quảng Trị trước ngày 15/9 - Ảnh 6.

The two ends of the level crossing up to the intersection at Km 607+920 have a rather steep slope...

Bàn giao mặt bằng sạch hạng mục cầu chui đường sắt ở Quảng Trị trước ngày 15/9 - Ảnh 7.

The road from Gio Chau commune to the intersection Km 607+920.

Bàn giao mặt bằng sạch hạng mục cầu chui đường sắt ở Quảng Trị trước ngày 15/9 - Ảnh 8.

From the intersection Km 607+920 to National Highway 1 through Gio Linh town, Gio Linh district.

Bàn giao mặt bằng sạch hạng mục cầu chui đường sắt ở Quảng Trị trước ngày 15/9 - Ảnh 9.

The above intersection is now a railway underpass.

Bàn giao mặt bằng sạch hạng mục cầu chui đường sắt ở Quảng Trị trước ngày 15/9 - Ảnh 10.

The underpass has been completed but the road section under the underpass is under construction.

Bàn giao mặt bằng sạch hạng mục cầu chui đường sắt ở Quảng Trị trước ngày 15/9 - Ảnh 11.

The electric pole is located blocking the road from the underpass to National Highway 1.

Bàn giao mặt bằng sạch hạng mục cầu chui đường sắt ở Quảng Trị trước ngày 15/9 - Ảnh 12.

Along with relocating the above electric pole, Gio Linh District People's Committee is urging the Project Management Board, Land Fund Development and Industrial Cluster of the district, and Gio Linh Town People's Committee to mobilize households to urgently dismantle compensated and supported works to hand over clean land before September 15.



Source: https://www.baogiaothong.vn/ban-giao-mat-bang-sach-hang-muc-cau-chui-duong-sat-o-quang-tri-truoc-ngay-15-9-1922309120650102.htm

Comment (0)

No data
No data

Same tag

Same category

Lost in cloud hunting in Ta Xua
There is a hill of purple Sim flowers in the sky of Son La
Lantern - A Mid-Autumn Festival gift in memory
Tò he – from a childhood gift to a million-dollar work of art

Same author

Heritage

;

Figure

;

Enterprise

;

No videos available

News

;

Political System

;

Destination

;

Product

;