Vietnam.vn - Nền tảng quảng bá Việt Nam

[Photo series] Entering August, let's see the 'shape' of Bien Hoa - Vung Tau highway through Dong Nai

(DN) - The Bien Hoa - Vung Tau Expressway project is under urgent construction with the goal of technical traffic opening on December 19, 2025. Many road sections and major intersections have taken shape.

Báo Đồng NaiBáo Đồng Nai05/08/2025

At Component 2 Project invested by Management Board 85, the intersection between Bien Hoa - Vung Tau Expressway and Ho Chi Minh City - Long Thanh - Dau Giay Expressway has taken shape. Photo: Minh Tai
At Component 2 Project invested by Management Board 85, the intersection between Bien Hoa - Vung Tau Expressway and Ho Chi Minh City - Long Thanh - Dau Giay Expressway has taken shape. Photo: Minh Tai
The bridges and access roads have gradually taken shape, creating a giant “asterisk” intersection. Of the three interconnecting intersections, the Long Thanh intersection has reached about 75% of the volume, the Long Thanh Airport intersection is almost completed, and the Tan Hiep intersection has reached 85% of the volume. Photo: Minh Tai
The bridges and access roads have gradually taken shape, creating a giant “asterisk” intersection. Of the three interconnecting intersections, the Long Thanh intersection has reached about 75% of the volume, the Long Thanh Airport intersection is almost completed, and the Tan Hiep intersection has reached 85% of the volume. Photo: Minh Tai
This is also the intersection with route T2 connecting to Long Thanh Airport. Photo: Minh Tai
This is also the intersection with route T2 connecting to Long Thanh Airport. Photo: Minh Tai
According to Management Board 85, currently, Project Component 2 output has reached 2,308/4,279 billion VND, reaching 54%, 1.55% behind schedule. Photo: Minh Tai
According to Management Board 85, currently, Project Component 2 output has reached 2,308/4,279 billion VND, reaching 54%. Photo: Minh Tai
Component 1 Project invested by Dong Nai Province Construction Investment Project Management Board includes 2 packages. Photo: Minh Tai
Component 1 Project invested by Dong Nai Province Construction Investment Project Management Board includes 2 packages. Photo: Minh Tai
Of which, package XL 18 (from Km0+000-Km6+200) is organizing 18 construction sites, with output reaching 414.4/1,261 billion VND (32.85%). Photo: Minh Tai
Of which, package XL 18 (from Km0+000-Km6+200) is organizing 18 construction sites, with output reaching 414.4/1,261 billion VND (32.85%). Photo: Minh Tai
Package XL 21 (from Km6+200-Km16+000) is organizing 17 construction sites, with output reaching 637/1,236 billion VND (50%). Photo: Minh Tai
Package XL 21 (from Km6+200-Km16+000) is organizing 17 construction sites, with output reaching 637/1,236 billion VND (50%). Photo: Minh Tai
Recently, the Dong Nai Province Construction Investment Project Management Board pointed out that many contractors have not met the progress requirements. The delayed works include: road embankment, weak soil treatment; material mobilization; bridge construction and beam casting... Photo: Minh Tai
Recently, the Dong Nai Province Construction Investment Project Management Board said that some contractors have not met the schedule. Photo: Minh Tai
Meanwhile, according to the plan, by December 19, 2025, the Bien Hoa - Vung Tau Expressway Project must be technically opened to traffic. Photo: Minh Tai
According to plan, by December 19, 2025, the Bien Hoa - Vung Tau Expressway Project will be technically open to traffic. Photo: Minh Tai

Xuan Luong - Minh Hanh - Minh Tai

Source: https://baodongnai.com.vn/tin-moi/202508/chum-anh-buoc-sang-thang-8-xem-hinh-hai-duong-cao-toc-bien-hoa-vung-tau-doan-qua-dong-nai-dcb3e53/


Comment (0)

No data
No data

Same tag

Same category

There is a hill of purple Sim flowers in the sky of Son La
Lantern - A Mid-Autumn Festival gift in memory
Tò he – from a childhood gift to a million-dollar work of art
Efforts to preserve the traditional Mid-Autumn toy making craft in Ong Hao village

Same author

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product