Vietnam.vn - Nền tảng quảng bá Việt Nam

Reopening the North-South railway section damaged by storm No. 6

VTC NewsVTC News29/10/2024


On the afternoon of October 29, Binh Tri Thien Railway Joint Stock Company announced that the North-South railway section through Sa Lung - Tien An section (Vinh Linh, Quang Tri ) has opened to trains.

At 3:30 p.m. on October 29, the section from Km 587+725 to Km 589+00 was returned to the track to test run 2 freight trains. At 5:05 p.m., the railway company returned the track (opening the Sa Lung - Tien An section) from Km 587+725 to Km 589+00 to run trains at a speed of 5 km/h.

North-South railway damaged by storm No. 6 (Trami)

North-South railway damaged by storm No. 6 (Trami)

Previously, due to the impact of storm No. 6 (storm Trami), the section of road from Km 587+725 to Km 589+00 and the stations and Sa Lung station were flooded, affecting the railway infrastructure and disrupting train operations.

After the water receded and the scene was inspected, Binh Tri Thien Railway Joint Stock Company determined that from Km587+300 - Km588+00, there was a phenomenon of rocks drifting to the left; the section from Km588+525 - Km589+00 was completely washed away, eroding the roadbed.

After the incident, Binh Tri Thien Railway Joint Stock Company focused on human resources, machinery and equipment to fix the above damages.

NGUYEN VUONG


Source: https://vtcnews.vn/thong-tau-doan-duong-sat-bac-nam-bi-hu-hong-do-bao-so-6-ar904644.html

Comment (0)

No data
No data

Same tag

Same category

Western tourists enjoy buying Mid-Autumn Festival toys on Hang Ma Street to give to their children and grandchildren.
Hang Ma Street is brilliant with Mid-Autumn colors, young people are excitedly checking in non-stop
Historical message: Vinh Nghiem Pagoda woodblocks - documentary heritage of humanity
Admiring Gia Lai coastal wind power fields hidden in the clouds

Same author

Heritage

;

Figure

;

Enterprise

;

No videos available

News

;

Political System

;

Destination

;

Product

;