According to the reporter's records, this cracked section of the road surface is about 10 meters long, dividing the route, posing a potential safety risk to people and vehicles. The initial cause was determined to be due to rising river water, great pressure causing the roadbed along the river to erode and slide.

To respond promptly, local authorities coordinated with functional units to mobilize forces to set up barriers, put up warning signs, and temporarily stop traffic through this road section to ensure safety. Traffic diversion plans were also deployed, guiding people to move to other routes.

At the same time, the authorities also temporarily reinforced the slope with stone gabions and sandbags to stabilize the slope and limit the risk of widespread landslides. At the same time, they assessed the extent of damage to promptly develop a plan to thoroughly handle this riverside route.


Vice Chairman of the Provincial People's Committee Hoang Phu Hien requested the forces to quickly deploy remedial measures, with the highest priority being to protect people's lives and property, and to be on duty 24/7 to control the situation and promptly respond to any unusual developments.


Currently, the initial remedial work has been basically completed to prevent the landslide from spreading. However, the authorities warn that due to the complicated developments of the storm, people should not travel or gather near the cracked area to avoid danger./.
Source: https://baonghean.vn/pho-chu-tich-ubnd-tinh-hoang-phu-hien-chi-dao-khac-phuc-su-co-nut-duong-ven-song-vinh-10307446.html
Comment (0)