Due to the impact of storm No. 10 and its circulation causing heavy rain over a large area, currently, in Tien Du commune, there are 3 landslide points on the dike on Ngu Huyen Khe river in Vinh Phuc, An Phu, Gioi Te villages with a total length of about 110m, 1 probe point at An Phu pumping station.
Comrade Ngo Tan Phuong directed Tien Du commune to urgently handle the landslide incident on Ngu Huyen Khe river dike. |
Faced with the above situation, Tien Du commune promptly grasped the situation and proposed solutions such as placing warning signs in dangerous areas, mobilizing 60 people from the shock force, 4 divers, 950 bamboo trees, 20,000 sacks, 365m3 of soil, 6 trucks, 2 excavators... arranging a permanent force ready to respond according to the motto "4 on-site".
Directly inspecting the landslide site, comrade Ngo Tan Phuong requested Tien Du commune to mobilize all forces to promptly fix and handle the incidents by October 4. Review the commune-level reserve fund to arrange resources to handle the landslide site. If it does not meet the requirements, send a document requesting the Department of Agriculture and Environment to arrange funds from the province's Natural Disaster Prevention Fund.
Tien Du commune's shock forces participated in handling the incident. |
Faced with complicated weather developments, Tien Du commune needs to continue to review and detect incidents related to flood and storm prevention works and deploy quick and timely remedial measures to ensure the safety of people's lives and property, essential infrastructure and agricultural production in the area.
Source: https://baobacninhtv.vn/tap-trung-cao-xu-ly-diem-sat-lo-bo-de-song-ngu-huyen-khe-tai-xa-tien-du-postid428054.bbg
Comment (0)