Vietnam.vn - Nền tảng quảng bá Việt Nam

[Photo] How is Mai Dich overpass after more than 1 week of opening?

Báo Nhân dânBáo Nhân dân22/05/2024


NDO - More than a week after opening traffic directions through two new overpasses, traffic conflicts at the Mai Dich - Ring Road 3 intersection ( Hanoi ) have significantly decreased.

[Photo] How is Mai Dich overpass after more than 1 week of opening to traffic? Photo 1

Since May 6, the two Mai Dich overpass units have officially opened to traffic and have a new traffic diversion plan.

[Photo] How is Mai Dich overpass after more than 1 week of opening to traffic? Photo 2

The two new overpass units are located right next to the old Mai Dich intersection overpass. Each side is nearly 8m wide, including 1 motorbike lane and 1 motor vehicle lane.

[Photo] How is Mai Dich overpass after more than 1 week of opening to traffic? Photo 3

After being put into use, the traffic organization through Mai Dich intersection will change. The old Mai Dich overpass will be separated into a highway axis exclusively for cars, connecting to the elevated Ring Road 3, with a maximum allowed speed for vehicles of 60km/h.

[Photo] How is Mai Dich overpass after more than 1 week of opening to traffic? Photo 4
Meanwhile, two new bridge units are for vehicles connecting from the highway to the urban roads at both ends.
[Photo] How is Mai Dich overpass after more than 1 week of opening to traffic? Photo 5

Actual records show that, more than a week after opening traffic directions through two new overpasses, traffic conflicts at the Mai Dich - Ring Road 3 intersection have clearly decreased.

[Photo] How is Mai Dich overpass after more than 1 week of opening to traffic? Photo 6
During rush hour in the morning of May 14, traffic conflicts at this intersection were basically reduced.
[Photo] How is Mai Dich overpass after more than 1 week of opening to traffic? Photo 7

After exiting Mai Dich overpass, vehicles will have 2 directions to go onto Ring Road 3 towards Thang Long Bridge - Noi Bai Airport or turn right to Hoang Quoc Viet, Co Nhue.

[Photo] How is Mai Dich overpass after more than 1 week of opening to traffic? Photo 8
[Photo] How is Mai Dich overpass after more than 1 week of opening to traffic? Photo 9
Notably, after more than a week of operation, the problem of motorbikes "straying" onto the old bridge has been completely resolved. The lane reserved for cars is very clear in both directions.
[Photo] How is Mai Dich overpass after more than 1 week of opening to traffic? Photo 10
The traffic intersection, which is often congested, became clear after more than a week of Mai Dich overpass opening.
[Photo] How is Mai Dich overpass after more than 1 week of opening to traffic? Photo 11
Vehicles move smoothly through Mai Dich overpass on the morning of May 14.
[Photo] How is Mai Dich overpass after more than 1 week of opening to traffic? Photo 12

Vehicles move smoothly through Mai Dich overpass on the morning of May 14.

[Photo] How is Mai Dich overpass after more than 1 week of opening to traffic? Photo 13
[Photo] How is Mai Dich overpass after more than 1 week of opening to traffic? Photo 14
[Photo] How is Mai Dich overpass after more than 1 week of opening to traffic? Photo 15
The median strip divides two lanes at Mai Dich overpass.


Source: https://nhandan.vn/anh-cau-vuot-mai-dich-ra-sao-sau-hon-1-tuan-thong-xe-post809241.html

Comment (0)

No data
No data

Same tag

Same category

Admiring Gia Lai coastal wind power fields hidden in the clouds
Visit Lo Dieu fishing village in Gia Lai to see fishermen 'drawing' clover on the sea
Locksmith turns beer cans into vibrant Mid-Autumn lanterns
Spend millions to learn flower arrangement, find bonding experiences during Mid-Autumn Festival

Same author

Heritage

;

Figure

;

Enterprise

;

No videos available

News

;

Political System

;

Destination

;

Product

;