Vietnam.vn - Nền tảng quảng bá Việt Nam

Tuyen Quang city recovers after flood

Việt NamViệt Nam25/09/2024


Decisive participation

During the recent flood, the city had over 13,600 households affected, many residential areas were deeply submerged in water. Immediately after the water receded, Comrade Ta Duc Tuyen, Member of the Provincial Party Standing Committee, Secretary of the City Party Committee chaired a meeting to discuss strengthening solutions for waste collection after floods and storms. City leaders directly inspected and directed at heavily flooded areas, mobilizing all resources to ensure safety for people, especially in residential areas, public works and production facilities.

The City Party Committee and People's Committee mobilized functional forces, including police, army, youth union members, businesses and social organizations, to focus on supporting environmental sanitation, restoring traffic infrastructure, electricity, water and communication. After only 5 days of rapid cleaning, Tuyen Quang city quickly removed the layer of mud and waste, restoring its original cleanliness. Specialized agencies also coordinated with medical forces to spray disinfectants to prevent disease outbreaks after the flood.

HTP Trading, Service and Production Company Limited ( Tuyen Quang City) promotes business activities after the flood, striving to complete the set plan.

In addition, the city also focuses on supporting people to overcome economic losses. Relevant units have promptly implemented timely support policies for people who suffered property and crop damage, as well as supporting production and restoring daily life. The local banking system has also stepped in with financial support packages, creating conditions for people to borrow capital to restore production.

The repair of electricity, water and other public utilities was also carried out urgently by local authorities and public service companies. Mr. Le Van Hai, Chairman of the Board of Directors of Tuyen Quang Water Supply and Drainage Joint Stock Company, said that the company quickly checked and fixed the problem to restore water supply to the people on the first day of water receding.

Power lines cut off to avoid danger during floods were quickly restored, ensuring normal life for people after the natural disaster.

Overcoming consequences, ensuring social security

According to statistics of Tuyen Quang City People's Committee, as of September 20, there were 16 damaged traffic routes in the city, including 10 urban routes and 6 communal routes. The estimated cost of repair is more than 22.8 billion VND. Immediately after the damage occurred, the City People's Committee directed the road maintenance management unit to deploy traffic safety work, immediately clear soil, rocks, garbage, and traffic flow, and assign officers and civil servants to coordinate with the management unit to inspect and be on duty 24/7 to grasp the situation and handle when necessary, such as: stretching ropes, placing warning signs to ensure traffic safety.

The recent flood broke the culvert, washed away a 30 meter long section of the inter-commune concrete road between Trang Da (Tuyen Quang City) and Tan Long (Yen Son), disrupting traffic since September 11. The City People's Committee promptly directed the Commune People's Committee and relevant agencies to build a temporary road through Hamlet 4, thanks to which people and students were able to travel normally by September 20.

The recent floods have caused significant damage to businesses in Tuyen Quang city. Many businesses were flooded, causing damage to goods, equipment and facilities, especially stores in the city center. Typically, Hung Hoa Electrical Appliance Company Ltd. suffered damage to household electrical products swept away by floodwaters; televisions, washing machines, refrigerators were submerged in water..., Vietcombank had 2 ATMs damaged, 1 passenger elevator, 1 cash elevator, rolling doors, large generators..., HDbank had ATMs, generators, basic construction systems on the first floor damaged...

Vincom Plaza Shopping Center suffered serious damage due to the power system failure in the basement, delaying the restoration of operations. Businesses were interrupted for many days, directly affecting revenue. Although banks promptly resolved the problem, they also faced infrastructure damage and had to focus resources on supporting customers during this difficult period.

Faced with the commercial damage caused by the flood, the leaders of Tuyen Quang city quickly directed relevant units to focus on overcoming the consequences, ensuring the early stabilization of business and service activities in the area. For the Vincom Plaza Commercial Center, the unit also urgently fixed the electrical problem in the basement to put the center back into operation as soon as possible. Enterprises and small businesses were encouraged to step up cleaning and repairs to quickly restart commercial activities. The city leaders also asked banks in the area to ensure the safety of the system and financial services, and support businesses and people to overcome difficulties after the incident.

Floods have severely affected people's agricultural production. Specifically, more than 902 hectares of rice, 178 hectares of corn, 63.7 hectares of vegetables, more than 91 hectares of aquaculture ponds, 12 fish cages, more than 9,000 poultry, 43 cattle... The City People's Committee has directed the People's Committees of communes and wards; the City Agricultural Service Center to inspect and guide people in handling fields, preventing diseases that often arise and cause harm after floods; synchronously implementing effective disease prevention and control measures, especially African swine fever, foot-and-mouth disease, lumpy skin disease...

Vice Chairman of the City People's Committee Nong Thi Toan said: After the historic flood, Tuyen Quang city is overcoming the consequences and gradually restoring production. The city's key task in the coming time is to focus all its efforts on overcoming the consequences, supporting people and promoting socio-economic development. The city has deployed funding to support people to overcome the damage caused by storm No. 3 (phase 1) allocated in Decision No. 18/QD-MTTQ-BVDCT dated September 18, 2024 of the Provincial Relief Mobilization Committee.

In the coming time, the City People's Committee will continue to direct the People's Committees of communes, wards, agencies and units to focus on directing and mobilizing forces to participate in helping and overcoming the consequences caused by flooding, stabilizing people's lives.



Source: https://baotuyenquang.com.vn/thanh-pho-tuyen-quang-phuc-hoi-sau-lu-199013.html

Comment (0)

No data
No data

Same tag

Same category

Hang Ma Street is brilliant with Mid-Autumn colors, young people are excitedly checking in non-stop
Historical message: Vinh Nghiem Pagoda woodblocks - documentary heritage of humanity
Admiring Gia Lai coastal wind power fields hidden in the clouds
Visit Lo Dieu fishing village in Gia Lai to see fishermen 'drawing' clover on the sea

Same author

Heritage

;

Figure

;

Enterprise

;

No videos available

News

;

Political System

;

Destination

;

Product

;