Vietnam.vn - Nền tảng quảng bá Việt Nam

Hai Duong issues alert level 3 on some rivers in downstream areas

Báo Giao thôngBáo Giao thông14/09/2024


From 2:00 p.m. on September 14, the Steering Committee for Natural Disaster Prevention, Control and Search and Rescue of Hai Duong province issued a flood alert No. 3 on a number of river routes in the downstream area of ​​the province, including: level IV dike, right Thai Binh , Tu Ky district; dike in Ha Dong area, Thanh Ha district; left Kinh Mon, Kinh Mon town.

Hải Dương phát lệnh báo động 3 trên một số tuyến sông khu vực hạ lưu- Ảnh 1.

Authorities proceeded to clear two fish rafts on the river.

According to information from the Hai Duong Province Hydrometeorological Station, the actual water level measured at 1:00 p.m. on September 14, on Kinh Mon River at An Phu was 3.13m (0.23m above alarm level III), on Gua River at Ba Nha was 2.81m (0.11m above alarm level III), on Rang River at Quang Dat was 2.9m (equal to alarm level III).

The Hai Duong Provincial Steering Committee for Natural Disaster Prevention, Control and Search and Rescue requests the Steering Committee for Natural Disaster Prevention, Control and Search and Rescue of districts, towns, levels and sectors to deploy forces, strictly patrol and guard the dykes and be on duty against floods according to the alarm level, promptly detect and handle any damage to the dykes, embankments and culverts from the first hour based on the actual situation.

Continue to deploy forces, strictly carry out patrol and guard work on the dike routes to ensure that each location has someone to check and take responsibility; strengthen close monitoring of dike developments; prepare materials, means and human resources according to the "four on-the-spot" motto to handle and respond to all situations, ensuring safety for dike works.

To ensure safety, the unit requires the organization to prohibit all vehicles from traveling on the dike during flood warning time, except for vehicles permitted to travel on the dike, and strictly manage vehicles traveling on the dike according to regulations. Prohibit the operation of ferries; clear the dike roof and surface to ensure the effectiveness of dike patrol and guard work, and detect incidents, leaks, and damage.

The Provincial Military Command and the Provincial Police are ready with rescue forces and vehicles to promptly respond when requested; organize 24/7 on-duty, closely monitor flood developments; strictly comply with reporting regulations as prescribed.

The Chairman of the District People's Committee, heads of relevant departments, branches, agencies and units shall be responsible before the Chairman of the Provincial People's Committee if they are subjective, negligent in leadership and direction, slow in responding to floods leading to construction incidents, failure to promptly detect serious incidents, causing great damage to people and property.



Source: https://www.baogiaothong.vn/hai-duong-phat-lenh-bao-dong-3-tren-mot-so-tuyen-song-khu-vuc-ha-luu-192240914171030052.htm

Comment (0)

No data
No data

Same tag

Same category

Visit Lo Dieu fishing village in Gia Lai to see fishermen 'drawing' clover on the sea
Locksmith turns beer cans into vibrant Mid-Autumn lanterns
Spend millions to learn flower arrangement, find bonding experiences during Mid-Autumn Festival
There is a hill of purple Sim flowers in the sky of Son La

Same author

Heritage

;

Figure

;

Enterprise

;

No videos available

News

;

Political System

;

Destination

;

Product

;