Vietnam.vn - Nền tảng quảng bá Việt Nam

Salvaging and detonating a bomb near the riverbank in Ha Tinh

Báo Tiền PhongBáo Tiền Phong10/10/2024


TPO - An American-made bomb weighing about 250-300kg was discovered near the edge of the Ngan Mo River in Ha Tinh and was safely salvaged and detonated by authorities.

Close-up of the detonation of a bomb discovered during the construction of a landslide embankment. Video : Pham Truong

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 1

On October 9, the Cam Xuyen District Military Command (Ha Tinh) coordinated with the Engineering Department (Ha Tinh Provincial Military Command) to deploy a plan to salvage a bomb discovered on the edge of the Ngan Mo River (Cam Due Commune, Cam Xuyen District).

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 2

Two days ago (October 7), a group of workers working on a project to repair landslides on the left bank of the Ngan Mo River discovered a bomb lying 2-3 meters underground, next to the riverbank, so they reported it to local authorities.

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 3

After checking, the authorities recovered the bomb.

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 4

Initial inspection determined that this bomb was left over from the war, a 500-LB GP MK3 MOD1 bomb made in the US.

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 5

The bomb is still quite intact, weighs about 250-300kg, is about 1.5m long and nearly 50cm wide.

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 6

Authorities checked the bomb before taking it to the disposal site.

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 7

The bomb was moved to the training ground of Thach Ngoc commune (Thach Ha district) for safe detonation.

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 8

Engineers prepare to detonate the bomb.

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 9

The project to repair the embankment on the left bank of Ngan Mo River (Cam Due Commune, Cam Xuyen District, Ha Tinh) has a total investment of more than 14 billion VND, aiming to ensure the safety of people and civil infrastructure before the rainy and stormy season. The project is about 400m long, the embankment is 4.5 - 5m high, built with concrete and steel. The project started construction last August and is expected to be completed by the end of the year.

Half-ton bomb discovered during riverbank embankment construction
Half-ton bomb discovered during riverbank embankment construction

Arrested suspect who threw 'gasoline bombs' at 3 banks in Phu Yen
Arrested suspect who threw 'gasoline bombs' at 3 banks in Phu Yen

Day and night construction of embankments to overcome riverbank erosion in Ha Tinh
Day and night construction of embankments to overcome riverbank erosion in Ha Tinh

Pham Truong



Source: https://tienphong.vn/truc-vot-huy-no-qua-bom-canh-mep-song-o-ha-tinh-post1680835.tpo

Comment (0)

No data
No data

Same tag

Same category

The beauty of Ha Long Bay has been recognized as a heritage site by UNESCO three times.
Lost in cloud hunting in Ta Xua
There is a hill of purple Sim flowers in the sky of Son La
Lantern - A Mid-Autumn Festival gift in memory

Same author

Heritage

;

Figure

;

Enterprise

;

No videos available

News

;

Political System

;

Destination

;

Product

;