At Long Binh Depot (Thu Duc City) - the "brain" of Metro Line 1, the atmosphere of preparation for the commercial operation day on December 22 is very urgent.
Technicians check Metro Line 1 train at Long Binh Depot. Photo: Minh Quan
This is where the Control Center (OCC), train parking lot, repair and maintenance system of equipment and rails are concentrated. High-pressure tasks In the central control room, a working day of team leader Le Van Vinh and his teammates begins with checking operations on the computer screen. The large room with 5 rows of computers and large screens displays the operating status of the entire system. "All information from the train driver, stations and electrical systems must be fully checked and confirmed before creating the train schedule. On time, the first train will leave Long Binh depot, heading to Ben Thanh station" - Mr. Vinh shared.Maintenance staff must check every part of the ship in detail to ensure there are no problems. Photo: Minh Quan
Located in the middle of Long Binh Depot is the Metro No. 1 Train Maintenance and Repair Center. After each trip, trains are brought back for meticulous inspection of every detail. Technicians not only focus on checking the parts under the train, but also conduct thorough inspections inside and on the train roof, ensuring that all equipment is working perfectly and without problems.Panorama of Long Binh Depot. Photo: Minh Quan
Ms. Van Thi Huu Tam - Deputy Director of Urban Railway Company No. 1 (HURC1) - said that all 500 employees including: 291 station staff, 9 station managers, 61 train technicians, 24 dispatch technicians, 64 maintenance staff... have been thoroughly trained. According to Ms. Tam, after the trial run at 100% capacity (from November 11 to 17), all train service staff are still working to be truly proficient when officially serving customers. Metro Line 1 will be divided into two operating phases. In Phase 1 (first 6 months), Metro Line 1 will operate 200 trips/day with 9 trains, from 5:00 to 22:00. Train intervals during peak hours are 8 minutes, and during normal hours are 12 minutes. In Phase 2, it is expected to increase to 276 trips/day. The operating time is from 5:00 to 23:30, with an interval of 5-8 minutes during peak hours and 10 minutes during normal hours, and 15 minutes during off-peak hours. Each train trip lasts 29 minutes, with a route of 19.7km from Ben Thanh Station (District 1) to Suoi Tien Station (Thu Duc City). Source: https://laodong.vn/cong-doan/500-nhan-su-san-sang-cho-ngay-metro-so-1-lan-banh-1432281.ldo
Comment (0)