Vietnam.vn - Nền tảng quảng bá Việt Nam

Construction of emergency anti-erosion embankment on Tam Tien beach

Việt NamViệt Nam18/03/2024

The emergency coastal anti-erosion embankment in Ha Loc village is invested by the Provincial Management Board of Investment and Construction of Agricultural and Rural Development Works with a capital of 75 billion VND, to be implemented in 2024.

The project's objective is to invest in building a seawall to prevent coastal erosion in Ha Loc village, ensure the safety of property and lives of people in the project area; contribute to regenerating the beach and developing the socio -economy of the project area.

The scale of construction investment includes a coastal protection embankment about 0.52km long in Ha Loc village; the embankment roof structure is made of precast concrete components, the embankment foot is protected by prestressed piles, the top of the embankment is made of reinforced concrete wave-breaking wall combined with concrete traffic road; the top of the embankment is built with management and operation road and wave-breaking wall to ensure anti-wave overflow at the design frequency; the management road has a concrete structure with a 5m wide road surface...


Source

Comment (0)

No data
No data

Same tag

Same category

Visit Lo Dieu fishing village in Gia Lai to see fishermen 'drawing' clover on the sea
Locksmith turns beer cans into vibrant Mid-Autumn lanterns
Spend millions to learn flower arrangement, find bonding experiences during Mid-Autumn Festival
There is a hill of purple Sim flowers in the sky of Son La

Same author

Heritage

;

Figure

;

Enterprise

;

No videos available

News

;

Political System

;

Destination

;

Product

;